Skip to content
Block height specification no chain yet
Active validators 0 / 75 floor 7 · standby 0
Security tier not yet established
TPS · current specification
ADM in circulation 0 specification only
Network status Open view validators, blocks, mempool
Specification phase. Values shown are placeholders for layout. No live chain.
§ Roadmap · /roadmap

No dates.
Entry conditions.

Adamant does not commit to calendar dates. Each stage opens when its prerequisites are met and not before. This is the whitepaper’s voice applied to project planning.

  1. R.01
    shipped

    Specification

    Whitepaper v0.1 published; thirteen sections, parsed inline at /spec.

    Entry: A public, versioned document that fully describes the protocol.

    Gates
    • All thirteen sections complete
    • No outstanding TODO blocks in spec text
    • Material decisions logged in /updates
  2. R.02
    in flight

    Cryptographic audits

    Independent review of every consensus-critical primitive and the synthesis around them.

    Entry: Per-primitive audit reports published verbatim alongside the commit they targeted.

    Gates
    • Halo 2 wrapper audit complete
    • Threshold-BLS DKG audit complete
    • Wesolowski VDF parameter review
    • Adamant Move VM audit
  3. R.03
    in flight

    Reference implementation

    A single-binary Rust client implementing all four roles; see /developers/status for module readiness.

    Entry: CI passing across all crates; reproducible-build pipeline produces a verifiable release artefact.

    Gates
    • Consensus crate · feature complete
    • Mempool · two-regime operational
    • Shielded VM execution · feature complete
    • Reference wallet · sign + verify
  4. R.04
    queued

    Public testnet

    Open network exercise with the reference client. Open to anyone; carries no value.

    Entry: At least 7 independently-operated Node Runners online for 30 consecutive days at Tier II (N≥15) with no consensus failures.

    Gates
    • 7+ operators across 4+ ASNs
    • 30-day stability at Tier II
    • Mempool regime transitions exercised
    • View-key disclosure exercised end-to-end
  5. R.05
    queued

    Mainnet

    The chain self-activates the moment 7 validators are simultaneously registered, stake-eligible, and online.

    Entry: Audits clean, reference implementation feature-complete, testnet stable, security tier signal aligned.

    Gates
    • All R.02 audits resolved
    • Reference implementation released under reproducible build
    • Public testnet ran for ≥ 90 days at Tier II+
    • Genesis cohort registration opens